“In architectural terms they designed a wonderful building that makes an impact on everybody and created a truly functional and efficient airport that facilitates the flow of passengers through the building.” Jose Manuel Hesse Martin, Plan Barajas Director.
The terminal, which is the biggest in Spain, was commissioned to enable Barajas International Airport to compete with major hub airports within Europe. The core building comprises a sequence of parallel spaces separated by a linear block allowing daylight to penetrate deep into the interior. The same form is applied to the satellite, which is composed of two linear blocks, one for passport control and the other containing the gates.
The bamboo linear roof structure is connected above by a chain of roof lights, permitting maximum flexibility in the arrangement of accommodation on each of the floors. This enables the building to be expanded in phases. The new terminal has a metro, rail station and landside transit link to the existing terminals as well as a transit system linking the core terminal with the satellite.
Pedestrian circulation to and from the parking area is concentrated along the face of the parking structure, creating an animated façade opposite the terminal. The layout of the arrivals hall creates clear and separate routes to the various modes of ground transportation, giving equal weight to public and private transport. The arrivals and departures forecourts as well as the train and metro station are covered by a standard module of the roof, which encompasses the entire sequence of activities from drop-off to departure gate.
Environmental measures, aimed at significantly reducing energy consumption, include a stratified cooling system, displacement ventilation supply to the piers, low level air supply to all other passenger areas, extensive shading to the facades and roof lights, zoned lighting and the collection of rainwater to irrigate the landscape.
Project information:
- Place: Madrid Airport, Spain
- Date: 1997-2005
- Client: AENA
- Total Area: 1.158.000 m²
- New Terminal Building: 470,000 m²
- Satellite: 315,000 m²
- Cost: £448 million
- Structural Engineer: Anthony Hunt Associates/TPS with OTEP/HCA
- Architects: Rogers Stirk Harbour + Partners
- Co-Architects: Estudio Lamela
- Lighting Consultant: Arup/Speirs and Major Associates
- Façade Engineer: Arup
- Landscape Architect: dosAdos
Awards:
2008
- Airport Council International Award for Best European Airport
- RIBA Stirling Prize
- Istructe Award for Commercial or Retail Structures
- AIA/UK Excellence in Design Award
2006
- RIBA European Award
--RSHP
[edit] Related articles on Designing Buildings Wiki
- Airports.
- CIBSE Case Study: Christchurch International Airport.
- Gatwick second runway.
- Heathrow Terminal 5.
- Heathrow Terminal 5 named one of world's top airports in 2019.
- Hong Kong Boundary Crossing.
- London City Airport expansion.
- McArthurGlen Designer Outlet Ashford.
- Procurement of Heathrow T5.
- Taiwan Taoyuan International Airport Terminal 3.
- Thames estuary hub airport.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.